Price: | US $ 30/Piece |
---|---|
Trade Terms: | FOB,CFR,CIF |
Min Order: | 300/Piece |
Pay Type: | L/C,T/T |
Prod Model: | HJA-6822A |
---|---|
Markets: | North America,South America,Eastern Europe,Southeast Asia,Africa,Oceania,Mid East,Eastern Asia,Western Europe |
Size: | 600 X 800 X 1200 mm |
Static Load: | 800 Kgs |
Suitable Standard: | IEC197-2, Ein4194 |
Type: | Server Cabinet |
Usage: | Network Integration System |
Installation: | Vertical |
Fan Number: | Two |
Certification: | ISO |
Condition: | New |
Capacity: | 22u |
Spain New Style 22u Server Storage Network Rack
Product pictures:
Feature:
Exquisite design with precise craftsmanship;
Welded steel frame for front and back part, which can be flat packing, easy to transfer;
Arc shapedented vented front door with hexagonal holes,can turn over 180 turning degree:
Vented rear door with hexagonal holes;
Removable side panel wit latch, easy to install(optional lock);
Adjustable feet and castors are available simultaneously:
Cable entry on the top, adjustable cable entrance at the bottom with panel:
Advanced handle locks for front door, optional other lock;
S-shaped mounting profile, free to move forward and back;
Efficient baying kit of cabinet, earthing kit:
Optional plinth to fix cabinet on floor; under base cable entry:
Various optional Accessories for common using:
Unassembled packing, about 2/5 of original volume, save container space
Standard:
Comply with IEC197-2, EIN4194 Standard;
Loading Capacity:
800 Kgs;
PRODUCT DETAILS:
Product name : | Network cabinet |
(1) Model No.: | HJA-6822A |
(2) Size : | 600*800*1200MM |
(3) Capacity : | 22 U |
(4) Brand name : | Huayu |
(5) Cabinet standard : | 19'' inch inner installation |
(6) Material : | High quality SPCC cold rolled steel T:1.0-1.2mm |
(7) Place of origin : | Guangdong China (mainland) |
(8) Color : | Black, White or Gray (Special Color on Request) |
(9) Packing : | Flat ,packing or assembled packing |
(10) Loading capacity: | 800KG |
(11) Thickness : | 1.0-1.5mm |
(12) Installation : | 19'' inch inner installation |
(13) Surface finish : | Degreasing,pickling,phoshating,phoshating, powder coating |
(14) Delivery details: | 6 working days |
(15) Packing: | (a) Film around the spareparts |
(b) EPE corner protectors in the four corners of carton | |
(c) High quality cartons with strip . |