Price: | US $ 30Pallet |
---|---|
Min Order: | 100Pallet |
Pay Type: | L/C,T/T,D/P,Western Union |
Prod Model: | HGLS-12121 |
---|---|
Color: | Blue and Yellow |
Pallet Size: | 1200mm*1200mm and Others |
Steel: | Cold Rolled |
Hole Distance: | 50mm and 75mm |
Temperature Of Warehouse: | -25-25 Degree |
Service: | Layout Drawing and 3D Picture |
Material: | Steel |
Structure: | Rack |
Mobility: | Adjustable |
Height: | 5-15m |
Closed: | Open |
Development: | New Type |
Serviceability: | for Special Purpose |
Weight: | 500-1500kgs |
Warehouse storage High Density Steel Drive in Pallet Racking(shuttle system)
Drive in rack consists of upright frame, pallet rail, single and double side arm, top beam, back beam, single and double side spacer, big and small top bracing, guide rail, upright protector and so on.
Details of Drive-in Racking:
1. Upright frame is same as pallet rack's upright.
2. Corbel and corbel rail
Loading capacity | Leghth | Width | Height |
500-3000Kg/Layer | ≤4000mm | ≤1300mm | 1000-9000mm |
Design: | Professional design as your requirment: Choose the suitable type of materials as your load requirement; CAD drawing | ||
Color: | Blue; Orange; Light Grey; or as your requirement | ||
Price: | Direct Manufacture price according to your quantity,payment term | ||
Quick Delivery: | Within 25 days for ordinary order quantity. Big production capacity allow us in a position to make quick delivery. | ||
Certification: | ISO9001/BV | ||
Specail sizes also avaiable to specific storage needs. |
About Us Service
1. Q: Are you a factory or trading company?
A: We are a factory. Warhouse Rack is one of our featured products.
2. Q: Where is your factory located? How can I visit there?
A: Our factory is located in Hebei province, which is the steel center in china. You can fly to Beijing airport directly. You are warmly welcome to visit us whenever you are available!
3. Q: What is the raw material of your products?
A: As general, the raw material of steel code is Q235. Other steel is also available to clients' requirements.
4. Q: What is the term of payment?
A: As general, 30% T/T down payment and balance before shipping or L/C
5. Q: What is delivery times?
A: It depends on the order quantity and racking types. As general, within 25 days, for ordinary order quant of Warhouse Rack .
6. Q: Which port will be used as loading port?
A: Tianjin sea port, the closest port to us, is recommended strongly as loading port.
7. Q: May I know the status of my order?
A: Yes. We will send you information and photos at different production stage of your order. You will get the latest information in time.
8. Q: Are samples available?
A: Yes. Short sections of samples could be provided, they are free of charge, but international courier costs to be borne by clients.
9. Q: Is Galvanised Finish available for pallet racks?
A: Yes. Pallet raking posts and bracings are available with galvanized finish.
10. Q: How can I get your quick quotation on my pallet racking project?
A: As different clients and projects have different needs of racking dimensions and specification, as general, for quick quotation, we need to know following info,
Please feel free to contact us now, if you have any inquiry or question about Warhouse Rack .